Solution 02 · Operations & Control

"Everything goes through me and something is going to fall over."

Stop the work running on what you remember.

For businesses where work comes in fine, but is held together by the owner's memory. We work on how it gets handled afterwards: what happens between someone asking for something and that something being done and recorded.

Signals

When people get in touch.

It is almost never an ordinary Monday. There is usually a specific trigger, and it is normally one of these.

What you are buying

You are not buying a CRM.

You are buying an end to being your business's single point of failure.

You are buying the information living somewhere other than your head, the ability to take a day off without it all collapsing, and the ability to delegate without explaining each thing three times.

There may well be a tool at the end. It may be the one you already use, or a well-built spreadsheet. The tool is a consequence of the order, not a substitute for it.

The limit, said up front

We do not sort out your whole company.

The first project works on one or a few critical workflows, named in the proposal. Everything else stays out until there is a reason to go in.

We say this before you have to ask, because disorder has an awkward property: it expands while you look at it. A project with no written ceiling becomes infinite, gets expensive for you and stops making sense for us.

A critical workflow looks like this:
order → production → packing → dispatch → delivery
booking → service → payment → history

How it works

From the workflow in your head to one that is written down.

First we pick which workflow. Then we make it exist outside you.

01 · Look

A real working day

This one cannot be seen from outside: we come in, watch how work arrives today, where the information lives and where it breaks.

02 · Choose

The workflow that matters most

One. The one that costs money or clients when it fails. It gets named in the proposal and becomes the ceiling of the project.

03 · Structure

Steps, states and owners

The process written as it actually happens, not as it should. With the states that exist and who answers for each one.

04 · Centralise

One source of truth

One place where that workflow's information lives. One, not five. It can be the tool you already use.

05 · Operate

Someone actually uses it

Training and one supervised day of work. A system existing means nothing if nobody uses it.

06 · History

A history you can look back on

What happened is on the record, and someone who isn't you can go and look it up.

No custom software required. A working operational system, required. If you finish the project working the same way as before but with documents, we have not delivered.

How we know it worked

The test is written before we start.

Not at handover. And it is not "the system is ready" — it is this:

Not included

Sorting out the whole company · accounting, payroll and tax compliance · people management · physical inventory and field logistics · IT support · enterprise system migrations · and automating processes that are not written down yet, which is the rule we never break.

Prefer to start without talking to anyone?

Twelve questions, three minutes, and we place you on one of five levels of operational maturity. The result is calculated in your browser: you see it without giving us anything.

Take the self-assessment
Evidence

What we have delivered.

No result figures: we have not measured hours recovered or mistakes avoided on any project, and we are not going to estimate them.

Pilot · delivered

An accounting practice in Chile

Before: around fifteen clients and no written process; control lived in a spreadsheet only the owner knew how to use. After: the critical cycles documented, four written procedures and a source of truth replacing that spreadsheet. With training.

See the full write-up
Client

Hielos Maass

A small ice manufacturer. Orders arrived by message and were written in a phone's notes app. Operational review done on site and documented; the system is designed, not implemented. We put it that way because the order matters.

See the write-up

Let's start by working out which workflow is the critical one.

Thirty minutes, no charge. If it turns out there is not enough volume yet for sorting it out to be worth it, we'll tell you.

Let's talk about your business
30 minutes · no charge You pick the time at the end

And if the problem is not how the work gets handled, but that not enough of it comes in? That is the other door: Presence & Acquisition.